PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped shear walls at Elev. 5,6 (3rd and 4th Floor) Facing North (800x600).jpg Finished installing the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Installing platforms around Elev. 1,2,3 (4th Floor) Facing East (800x600).jpg
Next page Stripped shear walls at Elev. 5,6 (3rd and 4th Floor) Facing North (800x600)
Stripped shear walls at Elev. 5,6 (3rd and 4th Floor) Facing North (800x600)